Monolithic Slab Calculator

A 24 × 24 ft monolithic slab, 4 inches thick with a 12 × 18 inch thickened edge, takes about 12.4 cubic yards of concrete, so you order 12.5. The thickened edge adds 4.2 cubic yards to the 7.1 cubic yards in the flat slab.

Free · No sign-up · Last reviewed

Quick start:

Your project size

(ft)
ft
(ft)
ft
(in)
in
(in)
in
(in)
in

Total Ready-Mix Concrete Required

14.91 Cubic Yards (Order 15.0 yd³)

Pre-Mix 80-lb Bag Equivalent

672 Bags (4000 PSI Air-Entrained)

Want a real price for this monolithic slab calculator project?

Get up to 3 free quotes from local contractors. No obligation. Your numbers are included.

Materials list

MaterialQuantityUnitNotes
4000 PSI Ready-Mix Air-Entrained Concrete15.0Cubic YardsIncludes 10% subgrade variance & spillage
#4 (1/2") Deformed Steel Rebar (18" o.c. grid)5920-Ft Sticks1167 lin ft (780 lbs) with 15" lap splices
#57 Crushed Stone Base (4" compacted depth)14.8Tons15% mechanical compaction allowance included
10-Mil Heavy Duty Polyethylene Vapor Barrier828Square FeetASTM E1745 Class A puncture resistance
3-Inch Concrete Rebar Support Chairs72ChairsEnsures steel is suspended in upper third of slab
Pre-molded Asphalt Expansion Joint Strip108Linear FeetIsolates slab from adjacent foundation walls

Estimated cost: DIY vs. contractor

National Average
DIY Raw Materials Only
$4,152 – $5,026

Cost of raw lumber, concrete, shingles, wire, or stone without equipment rentals or labor.

Hired contractor
$8,280 – $11,880

Full installation: permits, site prep, skilled trade labor, equipment, and structural warranty.

Estimated Sweat Equity
~$5,491

Average trade labor savings if executed as a skilled DIY homeowner project.

Dual-Zone Monolithic Geometry Formula

Rendering formula...

Engineering Math for 30' × 24' (4" Slab at 4000 PSI)

  1. Slab Area = 30 ft × 24 ft = 720 sq ft.
  2. Center Slab Volume = 720 sq ft × (4 ÷ 12 ft) = 240.0 cu ft (8.89 yd³).
  3. Perimeter Footing Trench (12"W × 18"D) = 4.67 yd³.
  4. Total Net Concrete = 13.56 yd³. Factoring 10% subgrade waste = 14.91 yd³ (Dispatch order: 15.0 yards).
  5. Rebar Calculation: 17 runs × 30 ft + 21 runs × 24 ft = 1167 linear feet (#4 rebar = 780 lbs).
  6. Sub-base Gravel (4" depth): 8.89 yd³ × 1.45 tons/yd³ × 1.15 compaction = 14.8 tons.
Tip: Under National Average conditions, control joints must be saw-cut within 12 hours of pouring to prevent random shrinkage cracking. Concrete test cylinders should achieve 4000 PSI at 28-day cure.

Quick Reference Sizing & Coverage Table

Standard commercial specifications and pre-calculated project benchmarks.

Slab FootprintCenter Slab (Yards)Thickened Edge (Yards)Total Concrete (10% waste)Turnkey Poured Concrete Cost
20' × 20' (400 sq ft)4.94 yd³2.77 yd³8.50 Cubic Yards$5,500 – $7,600
24' × 24' (576 sq ft)7.11 yd³3.32 yd³11.50 Cubic Yards$7,400 – $10,200
30' × 40' (1,200 sq ft)14.81 yd³4.85 yd³21.60 Cubic Yards$13,800 – $18,900
40' × 60' (2,400 sq ft)29.63 yd³6.93 yd³40.20 Cubic Yards$25,500 – $34,800
International Residential Code Section R403.1.3

ACI 318 & IRC R403 Monolithic Footing Code

Monolithic thickened edge footings must extend below the local frost depth line or utilize frost-protected shallow foundation (FPSF) perimeter insulation per ASCE 32. Continuous #4 (1/2") rebar must be suspended with rebar chairs in both top and bottom halves of the footing trench.

How to use the monolithic slab calculator

  1. Enter the slab length and width in feet, and the thickness of the flat part in inches.
  2. Enter the width and total depth of the thickened edge, measured from the top of the slab down.
  3. Choose the waste allowance, then read the concrete to order, the rebar, the gravel base and the contractor range.

How much concrete does a monolithic slab need?

A monolithic slab is poured in one go, with the footing around the edge poured with it. Work out the flat slab as length × width × thickness, work out the edge as the perimeter × edge width × the depth that sits below the slab, add them, and divide by 27 for cubic yards. Our calculator adds 10% or 15% on top.

For a 24 × 24 ft slab, 4 in thick, with a 12 in wide edge that is 18 in deep:

  • Flat slab: 576 sq ft × (4 ÷ 12) = 192 cu ft = 7.11 cubic yards
  • Edge: 96 ft × 1 ft × (14 ÷ 12) ft ÷ 27 = 4.15 cubic yards
  • Total 11.26, plus 10% = 12.39 cubic yards, ordered as 12.5
SlabThicknessEdge (width × depth)ConcreteRebar (#4, 18 in grid)Gravel base
24 × 24 ft garage4 in12 × 18 in12.5 cu yd47 sticks11.9 tons
40 × 30 ft shop5 in12 × 24 in29.5 cu yd97 sticks24.7 tons
20 × 16 ft equipment shed6 in16 × 20 in11.5 cu yd28 sticks6.6 tons

What goes under a monolithic slab?

The slab needs a firm, level base and a moisture barrier. The calculator's list includes a 4-inch compacted bed of #57 crushed stone and 10-mil polyethylene. The 2024 International Residential Code, as summarized by a code reference site, requires interior slabs on grade to be at least 3.5 inches thick over at least 4 inches of clean granular fill, with a vapor retarder of at least 6-mil polyethylene lapped 6 inches at the joints. A 10-mil sheet exceeds that minimum, and local codes can add to it. Check what your building department requires.

Monolithic slab vs a separate footing and slab

A monolithic pour needs one concrete delivery and one finishing day, which is why it is common for garages, sheds and shops in mild climates where the footing does not have to reach deep frost. If your frost line is deep, the footing usually has to go deeper than a thickened edge, and a stem wall with a separate slab is the usual answer. Your building department sets the footing depth for your area.

Frequently asked questions

How thick should a monolithic slab be?

Four inches is the usual thickness for a garage or shed used by cars and light loads. Go to 5 or 6 inches for heavy trucks, a car lift or equipment. The model residential code sets 3.5 inches as the minimum for slabs on ground.

Do I need rebar in a monolithic slab?

Plans for monolithic slabs nearly always call for steel, at least in the thickened edge. The materials list gives #4 rebar on an 18-inch grid as a typical allowance. Your plans and inspector decide the size, spacing and cover.

How many bags would it take?

The 24 × 24 ft example is about 558 bags of 80-lb mix. That is why a monolithic slab is almost always ordered as ready-mix. Mixing and placing that many bags before the first batch starts to set is not realistic.

Sources and review

Prices and quantities come from the calculator above. Last reviewed . How our calculators work.