A 120 ft strip footing, 16 inches wide and 12 inches deep, takes 6.5 cubic yards of concrete once you add 10% for ragged trench walls. Six 12-inch round piers, 36 inches deep, take 0.5 cubic yards.

Free · No sign-up · Last reviewed

Quick start:

Your project size

(units)
units
(inches)
inches
(inches)
inches
(%)
%

Total Footing Concrete Volume

3.25 Cubic Yards (60 lin ft trench (16" W × 12" D))

80-lb Bag Equivalent

147 Bags (or 87.8 cu ft)

Want a real price for this concrete footing calculator project?

Get up to 3 free quotes from local contractors. No obligation. Your numbers are included.

Materials list

MaterialQuantityUnitNotes
3,500 PSI Foundation Grade Ready-Mix Concrete3.25Cubic YardsPoured below local frost line with 10% trench overcut allowance
#4 (1/2") Deformed Rebar Longitudinal Runs720-Ft SticksContinuous runs suspended on 3" chairs with 15" lap splices
Formwork Stakes & Lumber60StakesIRC R403 code-compliant dimensional stability

Estimated cost: DIY vs. contractor

National Average
DIY Raw Materials Only
$722 – $903

Cost of raw lumber, concrete, shingles, wire, or stone without equipment rentals or labor.

Hired contractor
$1,365 – $2,340

Full installation: permits, site prep, skilled trade labor, equipment, and structural warranty.

Estimated Sweat Equity
~$1,040

Average trade labor savings if executed as a skilled DIY homeowner project.

IRC Chapter 4 Foundation Strip & Pier Geometry

Rendering formula...

Footing Mathematical Derivation (60 lin ft trench (16" W × 12" D))

  1. Footing geometry type: STRIP.
  2. Raw calculated cubic volume before overcut: 2.95 cubic yards.
  3. Adding 10% over-excavation reserve for ragged trench walls: 3.25 cubic yards.
  4. Rounding order to nearest ready-mix truck increment: 3.25 cu yd.
Tip: Confirm footing depth extends beneath the official building department frost depth in National Average.

Quick Reference Sizing & Coverage Table

Standard commercial specifications and pre-calculated project benchmarks.

Footing ScopeExcavated DimensionsNet Concrete Yards80-lb Bag EquivalentTurnkey Pro Cost
Deck Piers (4 units)12" Diam × 36" Deep0.39 cu yd19 Bags$450 – $800
Deck Piers (8 units)12" Diam × 48" Deep1.05 cu yd52 Bags$950 – $1,800
Garage Strip (80 ft)16" Wide × 12" Deep4.39 cu yd218 Bags$1,900 – $3,600
Home Foundation (160 ft)20" Wide × 12" Deep10.97 cu yd545 Bags$4,800 – $8,900
International Residential Code (IRC 2024) Section R403

IRC R403 Footing Minimum Sizing & Frost Protection

Footings must extend below the local frost line (IRC R403.1.4.1) and rest on undisturbed natural soil. Minimum width for 1-story light frame buildings is 12 inches; 2-story buildings require 15 to 18 inches minimum.

How to use the concrete footing calculator

  1. Choose the footing type: strip (a continuous trench), pier (round tube forms) or pad (square footings).
  2. Enter the length in feet for a strip, or the number of piers or pads. Then enter the width or diameter and the depth in inches.
  3. Keep the 10% over-excavation allowance unless your trench is cut very clean, and read the cubic yards to order.

How much concrete do I need for a footing?

Multiply the footing's cross-section by its length, convert to cubic yards by dividing cubic feet by 27, then add an allowance for trench walls that cut wider than the form. Our calculator adds 10%.

Strip: Length (ft) × Width (ft) × Depth (ft) ÷ 27
Round pier: π × (Diameter ÷ 2)² × Depth × Count ÷ 27
Square pad: Width × Width × Depth × Count ÷ 27
Order = Volume × 1.10

For a 120 ft strip footing, 16 in wide and 12 in deep: 120 × 1.33 × 1 ÷ 27 = 5.91 cubic yards, × 1.10 = 6.50 cubic yards.

FootingSizeConcrete to order80-lb bag equivalent
Strip, house120 ft, 16 in wide × 12 in deep6.50 cu yd293 bags
Strip, garage80 ft, 20 in wide × 12 in deep5.50 cu yd248 bags
Round piers, deck6 piers, 12 in dia × 36 in deep0.50 cu yd23 bags
Square pads, posts4 pads, 24 × 24 in × 12 in deep0.75 cu yd34 bags

How many bags of concrete for a post or pier footing?

A single 12-inch round pier that is 36 inches deep holds about 0.09 cubic yards, so six of them take 0.5 cubic yards with the allowance. That is roughly 23 bags of 80-lb mix for all six, or about 4 bags per hole. At that size, mixing bags by hand is practical. A 6.5 cubic yard trench footing is not: order ready-mix.

How wide and deep should a footing be?

Footing size is set by your building code and your soil, not by a calculator. The model code sizes footings from the number of stories, the weight of the walls and the bearing strength of the soil, and the depth has to reach below the frost line for your area. Your building department decides which code edition and local amendments apply. Enter the size from your approved plans or your inspector's requirements, and use this page for the quantity.

Frequently asked questions

What is the difference between a footing and a foundation?

The footing is the wide base poured in the ground that spreads the weight of the structure over the soil. The foundation wall or slab sits on top of it. Footings are poured first, usually with rebar, and are inspected before concrete goes in.

Do footings need rebar?

Often yes, but it depends on your plans, soil and code. Our materials list includes #4 rebar for strip footings as a typical allowance: 14 twenty-foot sticks for the 120 ft house example. Follow your plans and inspector for the actual layout, lap lengths and cover.

Why add 10% to the footing volume?

Trench walls rarely cut exactly to the form size, soft soil caves in at the edges, and some concrete stays in the truck chute and wheelbarrow. Ten percent covers that for most jobs. Dig carefully or form the sides, and you can use less.