Choosing between buying individual concrete bags and ordering a ready-mix delivery truck depends on total project volume, site access, and mixing labor.
For small slabs and spot footings, pre-blended concrete bags are the practical choice. A 4×4 air conditioning pad requires 10 bags of 80-lb mix ($72 base DIY materials), which can easily be mixed in a wheelbarrow or plastic mortar tub in under an hour.
As pour volume grows, handling bagged concrete becomes physically demanding. A 10×10 patio poured 4 inches thick requires 62 bags of 80-lb mix (about 1.36 cubic yards with reserve)—nearly 5,000 pounds of dry mix. For mid-sized pours of this scale, renting an electric barrel mixer speeds up batching and ensures thorough, even hydration.
Once a project reaches several cubic yards, ordering a ready-mix truck is typically more practical than manual mixing. Delivered ready-mix concrete averages $155 per cubic yard according to our concrete cost calculator. Keep in mind that batch plants charge a $150 short-load fee on orders under 4 cubic yards. For full garage slabs, large driveways, and expansive patios, ready-mix eliminates mixing labor and delivers consistent batch-certified strength straight to your forms.