Excavation Calculator

A hole 30 ft long, 20 ft wide and 4 ft deep holds 88.9 cubic yards of soil in the ground. Once dug out, ordinary earth swells to about 111 loose cubic yards, which is 10 loads in a 12-yard dump truck.

Free · No sign-up · Last reviewed

Quick start:

Your project size

(ft)
ft
(ft)
ft
(ft)
ft

Loose Excavated Dirt Volume

111 Loose Cubic Yards (88.9 Bank Yards in Ground)

Dump Truck Haul Loads

10 Loads (12 yd³ Tandem Trucks) | 25% Swell

Want a real price for this excavation calculator project?

Get up to 3 free quotes from local contractors. No obligation. Your numbers are included.

Materials list

MaterialQuantityUnitNotes
Excavated Spoil Material (Common Earth / Loam)111Loose YardsExpanded from 88.9 bank cubic yards (BCY)
Tandem Dump Truck Disposal Hauls (12 yd³/load)10Truck LoadsStandard commercial earthwork hauling
Excavator Machine Rental Allowance1Mini Excavator3.5 to 5-ton track machine with tooth bucket

Estimated cost: DIY vs. contractor

National Average
DIY Raw Materials Only
$1,400 – $2,100

Cost of raw lumber, concrete, shingles, wire, or stone without equipment rentals or labor.

Hired contractor
$3,378 – $5,156

Full installation: permits, site prep, skilled trade labor, equipment, and structural warranty.

Estimated Sweat Equity
~$2,517

Average trade labor savings if executed as a skilled DIY homeowner project.

Bank Cubic Yards (BCY) to Loose Cubic Yards (LCY) Formula

Rendering formula...

Earthwork Swell Math for 30' × 20' × 4' Trench Pit

  1. Bank Measure in Ground (BCY) = (30' × 20' × 4') ÷ 27 = 88.9 cubic yards.
  2. Soil Type Expansion Factor (Common Earth / Loam) = 25% expansion upon digging.
  3. Loose Measure for Hauling (LCY) = 88.9 BCY × 1.25 = 111 loose cubic yards.
  4. Truckload Logistics = 111 LCY ÷ 12 yards per truck = 10 tandem truckloads.
Tip: In National Average, soil stockpiled on site requires silt fencing around the pile perimeter to satisfy municipal stormwater runoff ordinances.

Quick Reference Sizing & Coverage Table

Standard commercial specifications and pre-calculated project benchmarks.

DigIn the Ground (Bank)Loose to HaulTruckloadsInstalled Cost
Garage pad, 26×26×2 ft50.1 cu yd63 cu yd (25% Swell)6 Loads (12 yd)$1,903 – $2,904
Footing / small dig, 30×20×4 ft88.9 cu yd111 cu yd (25% Swell)10 Loads (12 yd)$3,378 – $5,156
Inground pool, 32×16×6 ft113.8 cu yd142 cu yd (25% Swell)12 Loads (12 yd)$4,324 – $6,599
Basement, 40×30×8 ft355.6 cu yd462 cu yd (30% Swell)26 Loads (18 yd)$13,511 – $20,622
OSHA 29 CFR 1926 Subpart P Excavations

OSHA 1926 Subpart P Trench & Soil Classification

Excavations 5 feet or deeper mandate protective systems (sloping, shoring, or trench shield boxes) based on OSHA Soil Class (Type A cemented soils, Type B silt/loam, or Type C gravel/sand). Excavated spoil piles must be placed at least 2 feet back from trench edges.

How to use the excavation calculator

  1. Enter the length, width and depth of the dig in feet.
  2. Pick the soil type. Each one swells by a different amount when it's dug.
  3. Pick the truck size. The result shows bank and loose yards, truckloads and a cost range.

How do I calculate excavation volume?

Multiply length × width × depth in feet and divide by 27. That's the bank volume, the soil as it sits in the ground. Then multiply by the swell factor to get the loose volume you'll actually haul. For the 30 × 20 × 4 ft dig: 2,400 ÷ 27 = 88.9 bank yards, × 1.25 = 111 loose yards.

How much does soil swell when you dig it?

Our calculator uses these swell factors:

SoilSwell30 × 20 × 4 ft dig, looseTruckloads (12 yd)
Clean sand or fine gravel12%100 cu yd9
Common earth or loam25%111 cu yd10
Dense wet clay35%120 cu yd10
Blasted rock or hardpan50%133 cu yd12

How many dump truck loads will I need?

Divide the loose volume by the truck's capacity and round up.

ProjectSizeLoose dirtTruckLoads
Garage pad cut26 × 26 × 2 ft63 cu yd12 yd6
Inground pool32 × 16 × 6 ft142 cu yd12 yd12
Basement40 × 30 × 8 ft462 cu yd18 yd26

Frequently asked questions

What does excavation cost?

For the 30 × 20 × 4 ft dig, our calculator estimates $3,378 to $5,156 with a contractor, including hauling. A pool dig runs $4,324 to $6,599 and a basement $13,511 to $20,622. Rock, a high water table and tight access raise the price.

Can I reuse the dirt instead of hauling it?

Often some of it, for backfill or grading. Keep the topsoil separate so you can spread it back over the yard. Anything you keep cuts the number of truckloads.

What's the difference between bank and loose cubic yards?

Bank yards measure the soil undisturbed in the ground. Loose yards measure it after digging, when it has broken up and takes more space. Trucks and disposal sites charge by loose volume.

Sources and review

Prices and quantities come from the calculator above. Last reviewed . How our calculators work.