Construction Material Price Index

In the 12 months to October 2026, U.S. producer prices rose +2.4% for ready-mix concrete, +7.8% for asphalt paving mix, +7.5% for construction sand and gravel, and +5.5% for crushed limestone. Over five years, all four are up between +31.5% and +53.2%.

Source: U.S. Bureau of Labor Statistics producer price indexes, via FRED. Data through October 2026 · Updated · Refreshed monthly

Price change by material

Producer price index changes by material, data through October 2026
Material1 month12 months5 yearsLast 24 months
Ready-mix concreteIndex 402.4 (October 2026)-0.1%+2.4%+31.5%
CementIndex 353.2 (October 2026)0.0%-0.4%+29.9%
Asphalt paving mixIndex 448.2 (October 2026)+0.6%+7.8%+35.4%
Construction sand & gravelIndex 626.1 (October 2026)+0.1%+7.5%+45.1%
Crushed limestoneIndex 527.4 (October 2026)-0.3%+5.5%+53.2%

These are producer prices: what plants and quarries charge, before delivery and installation. Each material links to its series on FRED.

Prices our calculators use

Our calculators use national material prices. We review them against the trends above, so a cost estimate on SpanSizer moves with the market rather than staying fixed.

MaterialPrice in our calculatorsUsed in
Ready-mix concrete, 3,000 psi$145 per cubic yardOpen
Ready-mix concrete, 4,000 psi$155 per cubic yardOpen
Ready-mix concrete, 5,000 psi$175 per cubic yardOpen
Hot-mix asphalt$105 – $135 per tonOpen
#57 crushed limestone$38 per tonOpen
Crusher run$32 per tonOpen
Pea gravel$48 per tonOpen
River rock$65 per tonOpen

Material prices only, before delivery. Local prices vary: use your city in any cost calculator to adjust labor, and ask local suppliers for a delivered price.

How to read this index

A producer price index tracks how prices change over time relative to a base period; the index level is not a dollar amount. The useful numbers are the changes. If ready-mix concrete is up +2.4% over a year, a quote you got last year for the concrete itself would typically cost about that much more today, before any change in delivery or labor.

We pull the latest data from FRED, the St. Louis Fed's database of Bureau of Labor Statistics series, at the start of each month. The BLS publishes each month's figures a few weeks after the month ends and sometimes revises recent months.

Frequently asked questions

Are concrete prices going up?

Producer prices for ready-mix concrete were +2.4% over the 12 months to October 2026 and +31.5% over five years, according to the BLS producer price index.

What does a price index of 400 mean?

An index measures price change against a base period, not dollars. A move from 100 to 400 means prices have roughly quadrupled since the base period. Compare changes over time rather than the level itself.

Why don't these numbers match my local quote?

The index tracks national producer prices, the price at the plant or quarry. Your quote adds delivery, short-load and labor charges, and local prices vary. Use the trend to judge whether a quote is moving with the market.

Sources

Price estimates for your project: concrete cost per yard, asphalt driveway cost, gravel cost calculator.